Bond Projects Timeline

  • completed projects

    • Elementary Schools
      • Purchase and deploy iPads for all students in grades 3-6
    • Richards Middle School
      • Improve cafeteria sound system
      • Install wireless clocks throughout the building
      • Purchase and deploy iPads for all students in grades 7-8
      • Replace stage curtains in the cafeteria
    • Fraser High School
      • Replace cafeteria lights with energy efficient lights
      • Replace scoreboards at football stadium, baseball field, JV and varsity softball fields
      • Purchase and deploy MacBook Air laptops for all students in grades 9-12
      • Replace stage curtains and auditorium seating at the Fraser Performing Arts Center

    projects in progress

    • Richards Middle School
      • Replace roof over 80s wing and art wing
    • Fraser High School
      • Renovate pool and locker rooms

    The following timeline is tentative and may change without notice. 

    2018 projects

    • Technology
      • Update classroom and media center technology
      • Replace teacher laptops 
    • Disney, Eisenhower and Twain Elementary Schools
      • Replace roofing (Eisenhower only), gutters and downspouts 
      • Install air conditioning and replace ceiling in gymnasium
      • Replace classroom coat cubbies and countertops
      • Repave parking lots, replace concrete sidewalks and curbs
      • Replace playground play surfaces and playground equipment
    • Richards Middle School
      • Install air conditioning in the gymnasium and upgrade building HVAC controls
      • Replace cracked tile outside cafeteria
      • Repave parking lots, bus loop, concrete sidewalk and curbs
      • Improve stormwater drainage system
      • Replace light poles outside the Idea Lab
    • Fraser High School
      • Remodel Pool area, including scoreboard, dehumidification system, and tile
      • Bring elevator controls and cab up to current standards
      • Renovate gym locker rooms 
      • Repave parking lot, concrete sidewalks and curbs
      • Construct additional parking area
      • Improve north athletic fields, including replacement of softball dugouts
    • Support Buildings
      • Administration Building
        • Replace gutters and downspouts
        • Replace elevator cab and upgrade controls
        • Replace concrete sidewalks
      • Operations and Maintenance
        • Repave asphalt parking lot
        • Replace concrete sidewalks
      • Transportation Building
        • Repave parking lot 

    2019 projects

    • Technology
      • Update network and communications
      • Replace staff tablets
      • Update shared laptop carts, classroom computers and TVs
    • Edison, Emerson and Salk Elementary Schools, and the Dooley Center
      • Replace roofing (Salk only), gutters and downspouts 
      • Install air conditioning and replace ceiling in gymnasium
      • Replace classroom coat cubbies and countertops
      • Repave parking lots, replace concrete sidewalks and curbs
      • Replace playground play surfaces and playground equipment  

    2020 projects

    •  Technology
      • Replace PC computers in classroom across district
      • Replace student devices purchased in 2015

     2021 projects

    • Technology
      • Update printers and sound systems throughout district
      • Update network cabling
    • Fraser High School
      • Replace stadium turf
      • Resurface track